Concrete foundations and house slabs in Hamilton
Got a bare section and a builder waiting? We dig out, prepare the base, box it, lay the mesh and pour your house slab, so the framing can start.
- Dig-out, base and boxing by the crew that pours
- Mesh, membrane and levels checked before the pour
- A slab ready for your builder to frame on
Pouring a house slab?

For your quote, tell us
- What’s being built, and roughly how big
- Whether you have plans or an engineer’s design
- What’s on the section now
- When your builder wants to start
Slabs for homes, extensions and sleepouts
A new house on a fresh section, a granny flat out the back, a lounge extension or a sleepout: they all start on a slab, and that slab sets the tone for everything built on top of it.
We pour to your plans and your engineer’s design. Our part is getting it level, square and right the first time, so your builder can get on with the framing.
We had Sam from solid earth worx excavate and complete a sand pad on a addition/renovation project with tight access and many obstacles such as in ground services and an existing building to work against, Sam tackled the job with ease.
What you get under your floor
- A platform built to the level on your plans, on firm ground
- Room left under the slab for your plumber and drainlayer
- Boxing, membrane, pods and block-outs set out to the plans
- Levels checked with the laser before the truck is booked
- A power-floated floor ready for your builder
One slab, three stages
Boxed with the polythene down, the mesh laid, then poured and finished.

Boxing and polythene 
Mesh laid 
Finished and curing
Hamilton ground under a house
Hamilton and its surrounds once had about 30 small lakes linked to peatlands and seven big peat bogs. The drains went in long ago, but plenty of sections still have soft, peaty pockets under the topsoil.
That’s why we do our own dig-out. We see what the ground is doing first-hand, and if a pocket needs taking out and building back up, the crew that finds it is the crew that fixes it. Your engineer’s design covers what the slab needs; we make sure it gets it.
What goes into a slab quote
- The floor area and the slab design on your plans
- How much digging and fill the platform needs
- Pods, thickenings and block-outs
- Access for the digger and the concrete truck
- The finish your floor covering needs
Send the plans if you have them. We’ll go through them with you and come out to see the section.
Slabs and foundations we’ve poured

Boxing and podsA house slab boxed, with the pods stacked ready to lay. 
Pour dayPouring a house slab around a block-out. 
Power floatingBringing a fresh slab up to a smooth floor finish. 
Pile holesPile holes with the tubes filled, ready for the frame. 
On a new sectionA house slab poured and boxed on a new subdivision. 
The building padA pad built up and compacted on geotextile before the slab.
House slab questions
Something we haven’t covered? Ring 0800 215 019 or add it to your quote request.
We are very pleased with the concrete work that Sam and his team have done for us. The finished product exceeded our expectations, and we appreciate the attention to detail…
Do you work from my engineer’s design?
Yes. We pour to the plans and the engineer’s details, and we’ll go through them with you before we start.
Can you do the site prep as well as the slab?
Yes. We strip the section, dig out any soft ground, build the platform and then pour, so there’s no gap between the earthworks and the concrete.
Do you pour slabs for extensions and sleepouts?
Yes. Extensions, granny flats, sleepouts and garages all start the same way, and tight access next to an existing house is everyday work for us.
Can I have a polished or ground floor?
Tell us the floor covering you have in mind and we’ll finish the slab to suit it.
Get your house slab quote
Send the plans or a sketch, the section’s address and what’s on it now. We’ll ring you back and come and walk the site.
Handy for your quote
- A photo or two of the area, from the street and up close
- A rough size, even paced out
- What’s there now, and anything that has to come out
- How the digger and the truck get in
Got it. Your job’s come through.
We’ll ring you back, talk the job through and come out to quote it.
